Started the month in chaos, as planned work on the kitchen and electrics finally got underway. The front room was full of kitchen paraphernalia, as was much of the rest of the house.
Meanwhile, the electricians were beavering away fitting a new fuse box, and putting in the wiring for the new cooker point, which also involved using a VERY BIG drill to put in the switch:
Finally the old cooker has been removed, and the worktops /cabinets on the other side of the kitchen pulled out, to allow a dishwasher to be fitted.
If all this isn't chaotic enough, all movable cabinets, the fridge, the freezer and the dresser will have to be moved out in due course so that a new vinyl floor can be laid.
Still hoping that we'll manage to get it all sorted before Christmas!
No comments:
Post a Comment